International Project:
General Electric
Gas Turbine (I)

Rosarito, Tijuana - Mexico

Scope

The recovery of rotor clearances and alignment based on the manufacturer’s criteria allowed the equipment’s nominal capacity to be restored. Currently, continuous condition monitoring ensures the optimization and operational stability of the asset.

Image gallery